New Design Charter School

The existing three-story building was previously occupied by medical office spaces. Now it is home to a campus for the New Design Charter School, with classrooms, offices, outdoor activity areas, and detached prefab classroom buildings.

The existing three-story building was previously occupied by medical office spaces. Now it is home to a campus for the New Design Charter School, with two stories of classrooms, a top floor for administrative use, outdoor activity areas, and detached prefabricated classroom buildings. LRA provided complete MEP engineering for this exemplary adaptive reuse project.

LRA is proud to have been a part of many New Design's construction projects. In addition to the campus at on Avalon, the main downtown campus has expanded to include more classrooms and a remodel and addition to the administrative facilities. Currently, renovations to an unoccupied church and Sunday school in Los Angeles, will transform the buildings into more classrooms for the growing organization.

Read More
Manufacturing Travis Premo Manufacturing Travis Premo

RAH Industries

Once the home of the Daily News, RAH Industries now occupies the 180,000 square foot building in Valencia, CA. The design included an extensive electrical distribution system to serve the hundreds of CNC machines, tubing benders, sheet metal working equipment, welders, and inspection stations.

Once the home of the Daily News, RAH Industries now occupies the 180,000 square foot building in Valencia, CA. The design included an extensive electrical distribution system to serve the hundreds of CNC machines, tubing benders, sheet metal working equipment, welders, and inspection stations. The wastewater system featured a dedicated collection system and clarifier for safe processing of machine waste water.

Read More
Adaptive Reuse, Education Travis Premo Adaptive Reuse, Education Travis Premo

KIPP Raíces Academy

This adaptive reuse project transformed a defunct big-box retail store into the first charter elementary school in East Los Angeles.

The KIPP Raíces Academy is a fun and challenging adaptive reuse project which brought the first charter elementary school to the area. Adaptive reuse projects like the KIPP Raíces Academy demonstrate LRA's flexibility and aptitude for problem-solving. The building was previously occupied by Big Lots! retail store. L+V Architects led the design team, while LRA shined as the MEP engineer.

After the transformation. The modern facade adds a welcome bit of flair to the neighborhood.

After the transformation. The modern facade adds a welcome bit of flair to the neighborhood.

The existing building featured a rooftop parking deck; part of which was transformed into a play yard for the students. Built to support vehicles, the roof structure presented some challenges mechanically. Minimal penetrations were allowed in the roof due to the extensive existing rebar and concrete, which made it a prime candidate Variable Refrigerant Flow (VRF).

A Mitsubishi City-Multi system was utilized, reducing holes in the deck to just refrigerant line penetrations, while maximizing the rooftop play yard. Each classroom possesses its own fan coil and temperature controls, which helps address the less-than-ideal sun exposures. Fresh-air is ducted in from the exterior walls to provide ventilation.

The energy-saving VRF system also allowed the existing electrical service to remain in-place, saving the client a significant amount of money and time.


Previous use of the site

Photo credit: L+V Architects

Read More
Office & Interiors Travis Premo Office & Interiors Travis Premo

Ganahl Lumber Pasadena

A showcase in adaptive reuse, this retail location and indoor lumber yard took the place of a former GM dealership and service center.

A showcase in adaptive reuse, this retail location and indoor lumber yard took the place of a former GM dealership and service center. LRA provided complete MEP engineering to transform the existing dealership.

The building was previously unconditioned; adding air conditioning to the retail store meant meeting the performance requirements of Title 24. Despite the limitations of the existing envelope, the project exceeded Title 24 compliance by almost 15% better than standard, all while keeping the HVAC installation costs as low as possible.

Photo credit: Onyx Architects

Read More