Quest Diagnostics Auto Chem Lab
Lewis Ross Associates provided complete MEP engineering for Quest Diagnostics Auto Chemistry laboratory expansion
Lewis Ross Associates provided complete MEP engineering for Quest Diagnostics Auto Chemistry laboratory expansion. The project consisted of 12 automated analyzers, all supplied with purified water, and discharging to laboratory waste. The project was challenging due to its location in an existing building on the second floor. The HVAC was augmented with new air handlers to address waste heat from the analyzers.
Lab sample analyzers
Laboratory waste
Purified water
UPS backup for uninterrupted operation
Connection to generator for extended power outages
Kaiser Permanente, North Hollywood
LRA is proud to be part of ongoing improvements at Kaiser Permanente’s North Hollywood campus. We have provided design and engineering services for…
LRA is proud to be part of ongoing improvements at Kaiser Permanente’s North Hollywood campus. We have provided design and engineering services for:
Central UPS - 500kVA central uninterruptible power system. The project involved intercept of incoming generator feed, connection to existing normal power bus duct to provide full UPS, emergency backup of entire building. Work was carefully planned and phased to minimize temp power (required for critical temperature-controlled facilities).
Laboratory Expansions - Upgrade and replacement of automated sample processing lines, laboratory waste, DOAS for laboratories.
IT Upgrades - Building-wide upgrades to cabling, tel/data rooms, server room cooling, local UPS.
Specimen Processing - Upgrade and replacement of automated specimen processing line.
Survey & Assessment - Campus-wide MEP survey and narrative describing the existing HVAC, electrical distribution, and laboratory piping systems with recommendations.
Getty Museum Improvements
Maintenance and alteration of the infrastructure of the campus requires a small army of facilities personnel, architects, engineers, and contractors. LRA is proud to have been a part of the museum's ongoing improvements, including expansion of their cold storage and upgrade of the network operations center.
The Getty Museum is akin to a small city. Maintenance and alteration of the infrastructure of the campus requires a small army of facilities personnel, architects, engineers, and contractors. LRA is proud to have been a part of the museum's ongoing improvements, including expansion of their cold storage and upgrade of the network operations center.
The network operations center upgrades included replacement of the main server room’s uninterruptible power source (UPS). Phasing was designed into the replacement process to minimize downtime in this 24/7 facility.